Ha Long Van Don expressway

Role
Construction Organization
Construction Package

- Ha Long - Van Don expressway is 54km in length with total investment at 12.000 bil dongs
- The package constructed by LICOGI 16 was XDCT 06 of the project: Ha Long – Van Don Expressway, distance from Km36+00 to Km43+00, including Ha Vay Bridge at Km40+923, pave asphalt of package 5 and paving novachip of Cam Y bridge (package 8).

Status

2015-2018

Location

Quang Ninh province