Project

Bac Giang – Lang Son (part: expressway)

Role
Construction Organization
Construction Package

- Bac Giang - Lang Son expressway is 64km long, with a total investment of 12,188 billion VND.
- Construction packages of LICOGI 16:
+ Package XL07-CT: Km59+000 – Km63+000: VND 162.01 billion
+ Package XL08-CT: Km64+000 – Km68+000: VND 170.51 billion
+ Package XL11-CT: Km78+000 – Km80+500: VND 140.84 billion
+ Package XL12A-CT: Km80+500 – Km84+500: VND 153.67 billion
+ Package XL20-CT: Km107+000 – Km109+000: VND 135.37 billion
+ Package XL10-CT: Km72+000 – Km78+000: VND 186.22 billion
+ Package XL-BTN.2: Km59+000 – Km84+000: VND 551.93 billion
+ Package XL-BTN.3: Km84+000 – Km109+000: VND 531.72 billion

Status

2017-2019

Location

Bac Giang and Lang Son Provinces, Vietnam